logo (18K)


BRIDGES
DESIGN, CONSTRUCTION, MAINTENANCE AND REPAIR
REFERENCE CD


ONLY US$7.99 FOR THIS ITEM (INCLUDES FREE SHIPPING)


When you put this Reference CD in your computer the Menu Program shown above will run.
This Reference CD consists of 9 documents of learning / training material, diagrams and images, 1712 pages in all.

This material deals extensively in the types, design, construction, maintenance and repair of a variety of bridges.  This Reference CD would be a useful resource to anyone working in, looking to work in, or studying in mechanical engineering and/or technology.  These manuals really are exceptional in their content and detail.

The images below show pages taken from these documents.










This Reference CD also includes Adobe PDF Reader for Windows 95, 98, 98SE, 2000, and XP to ensure you will be able to view the documents.


PILE CONSTRUCTION
(176 pages)
Headquarters, Department of the Army
FM 5-134, 18 April 1985

Basic Considerations
Materials
Pile-Driving Equipment
Pile Installation Operations
Allowable Loads on a Single Pile
Pile Foundations
Distribution of Loads on Pile Groups
Maintenance and Rehabilitation
Woods Used as Piles
IDENTIFY PROCEDURES USED FOR PILE DRIVING OPERATIONS
(GRAPHICS)

(14 pages)
U.S. Army Engineers, 10/15/98

Safety, Risk, and Environmental Concerns
Steps Used to Assemble a Pile Driver
Position Piles
Lashing
Centering
Driving
BRIDGE INSPECTION, MAINTENANCE AND REPAIR
(186 pages)
Departments of the Army and Air Force
TM 5-600/AFJPAM 32-1088, 6 December 1994

Introduction
Bridge Structures
Bridge Elements
Mechanics of Bridges
Bridge Construction Materials
Bridge Redundancy and Fracture Critical Members (Fcms)
Inspection Considerations
Bridge Component Inspection
Final Documentation
General Preventive Maintenance, Repair, and Upgrade
Steel Bridge Maintenance, Repair, and Upgrade
Timber Bridge Maintenance, Repair, and Upgrade
Concrete Bridge Maintenance, Repair, and Upgrade
DESIGN A TIMBER TRESTLE BRIDGE
(201 pages)
U.S. Army Engineers
09/21/98

Identify Reconnaissance and Site Requirements Bridge Site Reconnaissance Requirements
Bridge Site Characteristics

Design the Superstructure for a Timber Trestle Bridge
Design Considerations
Design Phases
Design Sequence

Design the Substructure for a Timber Trestle Bridge
Types of Abutments
Ppreliminary Design
Design Sequence

Design a Timber Trestle Bent
Preliminary Design
Design Sequence

Identify Centerline Layout Procedures
site Location and Drawings
Centerline Layout Procedures
BAILEY BRIDGE
(373 pages)
Headquarters, Department of the Army
FM 5-277, 9 May 1986

History and Use of the Bridge
Basic Equipment
Planning and Organization
Field Design and Classification
Roller and Layout
Assembly of Single-Story Bridges
Assembly of Double-Story Bridges
Assembly of Triple-Story Bridges
Traffic Control
Two-Lane Through-Type Bridge
Extra Widened Bailey Bridge M3
Deck-Type Bridges
Railway Bridges
Reinforced Bridges
Cable Reinforcement Set
Bridges on Piers
Panel Crib Piers and Towers
Special Launching Methods
Launching by Single Girders
Bridges on Barges
Bridge Maintenance and Repair
Expedient Uses of Panel-Bridge Equipment
Demolition of Bridge and Parts
NON-STANDARD FIXED BRIDGING
(558 pages)
Headquarters, Department of the Army
FM 3-34.343 (FM 5-446), 12 February 2002

Basic Considerations
Background Information
Reconnaissance and Preliminary Investigations

Classification, Reinforcement and Repair, and Posting
Classification
Reinforcement and Repair
Posting

Design
Bridge Superstructures
Substructure Design
Suspension-Bridge Design
Connections
Construction
Inspection and Maintenance
Bridging in Arctic and Subarctic Environments
MEDIUM GIRDER BRIDGE
(84 pages)
Headquarters, Department of the Army
FM 5-212, 7 February 1989

Medium Girder Bridge Components
Medium Girder Bridge 4-12 Bay SS Design
Medium Girder Bridge 1-12 Bay DS Design
Medium Girder Bridge 13-22 Bays Without LRS
Medium Girder Bridge 13-22 Bays With LRS
Medium Girder Bridge Design Pro Forma
Safety Rules for all Medium Girder Bridges
Medium Girder Bridge Building, Boom and Delaunch Tables
Counterweights for Medium Girder Bridges
MODEL BRIDGE - TIMBER TRESTLE CLASS 50 / 80
(61 pages)
Headquarters, Department of the Army
Graphic Training Aid No. 05-04-032, 25 January 1982

MODEL BRIDGE, FLOATING BRIDGE,PNEUMATIC FLOAT, SUPERSTRUCTURE(M4T6)
(59 pages)
Headquarters, Department of the Army
Graphic Training Aid No. 05-04-034, 25 January 1982


THESE DOCUMENTS ARE IN ELECTRONIC ADOBE PDF FORMAT


ONLY US$7.99 FOR THIS ITEM (INCLUDES FREE SHIPPING)