logo (18K)


SURVEYOR / SURVEYING
REFERENCE CD


ONLY US$7.99 FOR THIS ITEM (INCLUDES FREE SHIPPING)


When you put this Reference CD in your computer the Menu Program shown above will run.
This Reference CD consists of 10 documents (4 training documents and 6 graphics presentations), 989 pages in all, that deal extensively in the particulars of surveying.

This Reference CD would be a useful resource to anyone working, looking to work, or studying as a surveyor in contstruction, engineering, topographic, or conventional related careers.  These documents really are exceptional in their content and detail.

The images below show pages taken from these documents.


This Reference CD also includes Adobe PDF Reader for Windows 95, 98, 98SE, 2000, and XP to ensure you will be able to view these documents.


CONSTRUCTION SURVEYING
(248 pages)
January 4, 1985
Headquarters, Department of the Army

Survey Objectives
Road Surveying
Curves
Earthwork
Bridge Surveying
Site Layout
Traverse
GEODETIC CONTROL AND SURVEYING
(102 pages)
1 June 2002
US Army Corps of Engineers

Control Surveying Applications
Standards and Specifications for Control Surveying
Reference Systems and Datum Transformations
Horizontal Control Survey Techniques
Vertical Control Survey Techniques
Miscellaneous Field Notekeeping and Procedural Requirements
TOPOGRPAHIC SURVEYING
(330 pages)
16 January 2001
Headquarters, Department of the Army

Missions, Operations and Duties
Project Planning
Survey Recon
Datums, Grids, and Coordinate References
Conventional Survey-Data Collection
Traverse
Differential Levelling
Navstar GPS
Artillery Surveys
Airfield-Obstruction and Navaid Surveys
Reports, Briefings and Operation Orders
Mensural Conversion Charts
Control-Survey Standards
Basic Survey Computations
CONVENTIONAL SURVEYING
(Graphics Presentation)

(33 pages)
United States Army Engineer School

Perform Differential Levelling

Run a Level Circuit
Definitions
Terminology
Uses
Hand Signals
Recording Field Data

Adjust a Level Circuit
Adjusting Field Data
Equipment
Field Procedures
Errors in Leveling
TEST - ADJUST SURVEY INSTRUMENTS
(Graphics Presentation)

(17 pages)

Self-Levelling Survey Level
Set Components
Level Components
Operator Tests and Adjustments
Circular Level Test
Line of Sight Test
Adjustment

Geodimiter
Operator Tests and Adjustments
Level Vial Test and Adjustment
Circular Level Test and Adjustment
Optical Plumb Test and Adjustment
INSPECT SURVEY LAYOUTS
(Graphics Presentation)

(18 pages)

Vertical Control
Horizontal Control
Vertical Construction Layouts
Horizontal Construction Layouts

DIFFERENTIAL LEVELING ROD READING
(Graphics Presentation)

(10 pages)

Practical Exercise
SURVEYING PRINCIPLES
(Graphics Presentation)

(9 pages)

Surveying Principles
Elements of a Survey
Zenith and Nadir Angles
Interior Angles
Deflection Angles
Coordinate System
Errors
INTRODUCTION TO THE TRAVERSE
(Graphics Presentation)

(7 pages)

Two Categories: Open and Closed
Open Traverse
Closed External
Closed Internal
Point to Point
Process
TERRAIN ANALYSIS
(215 pages)
11 July 1990
Headquarters, Department of the Army

Natural Terrain
Man-Made Features
Natural Terrain
Lines of Communication, Cover and Concealment
Cross-country Movement
Line of Site and Zone of Entry
Final Overlay Preparation
Vertical Photography
Mathematical Techniques
Mensural Conversions
Weather
Aerial and Ground Imagery Sources

THESE DOCUMENTS ARE IN ELECTRONIC ADOBE PDF FORMAT


ONLY US$7.99 FOR THIS ITEM (INCLUDES FREE SHIPPING)